Abohilal, S A (2017) Investigating the roles of leaders, managers and their mutual roles in aligning strategy and project management in public sector organisations: the case of the Kingdom of Saudi Arabia, Unpublished PhD Thesis, , Brunel University.

Adams, K A (2023) A multi-hazard cascading risk model for coastal rail infrastructure: numerical modelling & engineering failure analysis, Unpublished PhD Thesis, , Brunel University.

Albar, A M (2022) The design and development of an intelligent adaptive extrusion system for additive manufacturing robotics in construction using advanced cementitious materials, Unpublished PhD Thesis, , Brunel University.

Aldawaish, B (2019) Investigating the relationship between top management teams' characteristics and organisational innovation: the mediating role of dynamic capabilities, Unpublished PhD Thesis, Business School, Brunel University.

Alfandi, G R (2015) Investigating risk management capability of construction firms in the Gulf Cooperation Council (GCC) countries, Unpublished PhD Thesis, Department of Mechanical Aerospace and Civil Engineering, Brunel University.

Allam, S I G (1986) Planning and scheduling: A new model for planning and scheduling construction projects, Unpublished PhD Thesis, , Brunel University.

Almutairi, A M S (2017) Protecting the rights of temporary foreign 'low-skilled' workers in the Saudi construction industry: a case for legal reform, Unpublished PhD Thesis, Department of Politics, History and Law, Brunel University.

Alrajehi, S H (2014) Importance of KPI identification and implementation in Kuwaiti construction industry, Unpublished PhD Thesis, Department of Mechanical Aerospace and Civil Engineering, Brunel University.

Alshammari, S A R (2019) Developing a comprehensive construction delay analysis technique, Unpublished PhD Thesis, Department of Mechanical Aerospace and Civil Engineering, Brunel University.

Benhaim, M (1997) Interfirm relationships within the construction industry: Towards the emergence of networks? A comparative study between France and the UK, Unpublished PhD Thesis, , Brunel University.

Clark, G G (1993) Rule-based integrated building management systems, Unpublished PhD Thesis, , Brunel University.

Cooke, R S (2006) The use of alternative energy technologies in buildings: the influence of engineering consultants, Unpublished PhD Thesis, Department of Mechanical Aerospace and Civil Engineering, Brunel University.

Ghadamsi, A (2016) Investigating the influence of procurement method selection on project performance in Libya, Unpublished PhD Thesis, Department of Mechanical Aerospace and Civil Engineering, Brunel University.

Howes, R (1983) Project management control utilising innovative forecasting and computerised data bases, Unpublished PhD Thesis, Department of Building Technology, Brunel University.

  • Type: Thesis
  • Keywords: automation; cost estimating; financial control; forecasting; mathematical modelling; monitoring; project budgeting; prototype development; 'S' curve models
  • ISBN/ISSN:
  • URL: http://bura.brunel.ac.uk/handle/2438/5392
  • Abstract:
    The prime objective of this thesis is to research and develop a new system of project budgeting, monitoring and forecasting to meet the needs of the Construction Industry. It is intended that this work will facilitate the means for more efficient control of projects from inception to final completion, utilising where possible the latest developments in computer technology. The initial stage of the work involves an investigation and appraisal of existing methods of formulating project budgets. In particular, attention is paid to previous work in the development of mathematical 'S' curve models, together with their limitations in use and application. Potential for future development is also identified. The thesis then focuses on the evolution of an improved modelling philosophy for project budgets and forecasts which overcomes previously known problems. In parallel with this work is the development of a computerised system intended to enable the testing of the model against live project data. The model finally selected is then tested against the extensive research work previously undertaken by the DHSS and the data collected from sixteen construction projects. To facilitate the development of a suitable control system to act as a vehicle for the application of the principles developed, a contextual survey is included. This survey is intended to provide an update of previous survey work undertaken by the author in 1977 and to further investigate factors orientated specifically to the objectives of the thesis. The research then concentrates on the development of an integrated set of sub-systems which contribute to the budgeting, monitoring and prediction of project expenditure. These systems are developed in accordance with the need to establish the financial status of projects both before, during and after they are completed. The overall system is based on the latest computer technology available and is designed to be flexible in its application. Tests documented in the text prove that the system operates both in principle and in practice. A further extension of the research is the use of the various project databases to provide information for a corporate control system which has been developed in principle. This thesis provides a significant step forward in computerised project budgeting and control utilising 'S' curve philosophy and provides a basis for further development. Potential exists for future development of the prediction and corporate control systems, together with software developments to improve general application over a wide range of industries and disciplines where project work is undertaken.

Jashapara, A (1995) Learning in organizations: A study of the UK construction industry, Unpublished PhD Thesis, Henley Management College, Brunel University.

Mesa Jiménez, J J (2021) Artificial intelligence for optimisation and demand side response in built environment, Unpublished PhD Thesis, , Brunel University.

Nam, T-J (2001) Investigations of collaborative design environments: a framework for real-time collaborative 3D CAD, Unpublished PhD Thesis, , Brunel University.

Naoum, S G (1989) An investigation into the performance of management contracts and the traditional methods of building procurement, Unpublished PhD Thesis, Department of Mechanical Aerospace and Civil Engineering, Brunel University.

Nathan, P (1991) Project planning and control systems: An investigation into their application and implications of usage in the UK construction industry, Unpublished PhD Thesis, , Brunel University.

Paling, D R (1982) Industrial relations in the building, civil engineering and engineering construction industries, Unpublished PhD Thesis, , Brunel University.

Rowlinson, S M (1988) An analysis of factors affecting project performance in industrial buildings with particular reference to design build contracts, Unpublished PhD Thesis, Department of Building Technology, Brunel University.

Sawacha, E O-O (1993) An investigation into safety attitudes and safety performance in the construction industry, Unpublished PhD Thesis, Department of Mechanical Engineering, Brunel University.

Steel, A C (1985) The diffusion of working time innovations in manufacturing and construction industry, Unpublished PhD Thesis, , Brunel University.

Zhao, Y (2022) An ontology-based semantic building post-occupancy evaluation framework and its application, Unpublished PhD Thesis, , Brunel University.